USAPVF
← Industries

Power Generation

Main Steam, Reheat, and Balance of Plant

Power plant flange supply across coal, gas, nuclear, and combined-cycle service. F91 and F92 on main steam, F347 on auxiliary, AWWA on raw water intake.

Main steam and hot reheat headers run in F91 modified 9 chromium-moly at temperatures from 1050 to 1200 degrees F. Welding consumables and procedures are tightly controlled. F92 with tungsten substitution extends service into ultra-supercritical units.

Auxiliary and balance of plant service uses F347 stabilized austenitic for high-temperature steam and F316L for condensate and feedwater service. Carbon A105 handles utility air, instrument air, and lower-temperature service.

Raw water intake and circulating water lines move into AWWA C207 plate-cut territory at the larger diameters. Class D or Class E covers most intake pressures. The intake station may have AIS compliance requirements if the utility is federally funded.

Common Standards

  • ASME B16.5
  • ASME B16.47
  • AWWA C207 on raw water
  • ASME Section III for nuclear

Common Materials

  • F91
  • F92
  • F347
  • F316L
  • A105
  • A516-70

Project in Power Generation?

Request Quote

PO Box 2889, Pearland TX 77588